House Extension

Why Extend
Extending your property can provide additional living space, increase property value, and cater to a growing family's needs. Common reasons for property extensions include adding bedrooms, creating home offices, and expanding kitchens. Consider local regulations and potential costs before proceeding.
Welcome to our fully managed solution for your project! We take care of every detail, ensuring a seamless experience from start to finish. Let us handle the complexities while you focus on what matters most. Your success is our priority!

Foundations and drainage
Dig the foundation and fill with concrete.

Blockwork and roof construction
Single storey extension in Frimley. Rendered outside giving the client a new kitchen/breakfast room

two storey side extension
increased the house by adding a larger living area and two bedrooms above. matching in the bricks and tile hanging to the existing building

Single storey extension in woking
A large single storey extension with a flat room and roof light.
Bifold doors leading to a kitchen/breakfast room and living area with underfloor heating installed into the screed.

Frequently asked questions
01
How much does an extension cost to do currently?
This is very hard for us to price without sitting down with you and discussing your requirements. There are many factors to be considered. single storey or double. Flat roof or pitched. Are you having a bathroom. the quickest and easiest way to be able to give you a quote in to arrange a meeting and go through your plans
03
Building control
You will need building control to monitor our work to ensure at the end of the job they are happy with the quality of work and you will receive a building certificate. Once the application and fees have been paid we liaise with them to arrange inspections when required.
02
How long does the extension take to finish
Again this will depend on if it's single or double storey and what fixtures you are having. for a single storey you should allow about 12 weeks approximately and for a double storey allow around 20 weeks. obviously this will depend on the final size but we always produce a build plan when we start a job.
04
How much input do you need from me.
This will depend on how much detail is provided at tender stage. through the build, you may find you want to modify the design or change some of the fixtures. its always cheaper to have everything confirmed before the builder starts as if thinks need to be changed once done, the cost of changing will be added to the contract.